Equipment Maintenance Log Template

A free equipment maintenance log template in CSV, with service type, meter reading, parts used, downtime, result and next service due columns.

Equipment Maintenance Log Template

A service history per asset: preventive and corrective work in one place, with meter readings, parts consumed, downtime, and the date or reading that triggers the next visit.

By Tibeau De Grauwe, FounderUpdated September 2026

  • 25 products free
  • No credit card
  • 10-min setup
Download the maintenance log template
CSV file, one row per service event, three assets worked through.

What is in the template

One row per service event, not one row per asset. A bandsaw with two entries this year shows both, in order, so the pattern is readable: a scheduled blade change in May, then an unscheduled drive belt failure six weeks later that cost nine hours of downtime and a note to check the tensioner next time.

The sample includes a statutory inspection on a forklift and a failed repair on a pressure washer, because both are cases the log has to handle: work that produces a certificate rather than a part, and work that did not fix the problem and needs a follow-up row.

Columns explained

Asset_IDThe tag on the machine. Repeat it on every service row so one asset has a readable history.
Service_DateWhen the work was done. Sorting by asset and date is the whole value of the log.
Service_TypePreventive, Corrective, or Inspection. The mix between the first two is the clearest health signal a fleet gives you.
Meter_ReadingHours, kilometres, or cycles at the time of service. Blank for assets with no meter.
Performed_ByIn-house or the contractor name, so recurring external costs are attributable.
Parts_UsedWhich spare parts were consumed, referenced by SKU where you stock them.
Parts_CostMaterial cost of the service. Cumulative parts cost against purchase price is what tells you when to replace rather than repair.
Labour_HoursTime on the job, whether or not it is invoiced.
Downtime_HoursHow long the asset was unavailable, which is usually a larger number than labour hours and a larger cost than both.
ResultPass or Fail. A failed service means the asset is still down and needs a follow-up row.
Next_Service_DueThe date or meter reading that triggers the next preventive visit. An empty value here is how services get missed.
NotesWhat was found, what was deferred, and anything the next technician should know before opening the panel.

What the log is supposed to tell you

Three questions justify keeping it. Is this asset getting worse, measured by corrective events per year and rising downtime? Is it worth repairing again, measured by cumulative parts and labour cost against what a replacement would cost? And which parts should be on the shelf, measured by what actually gets consumed rather than what a manual recommends?

A log that only records dates and a one-word description cannot answer any of them. The cost, downtime and parts columns are the ones that turn a compliance artefact into a decision tool, and they are also the ones most often left blank.

Where a maintenance spreadsheet breaks down

It is passive. Next_Service_Due is only useful if somebody opens the file and sorts by it, and preventive maintenance is exactly the kind of work that loses to whatever is urgent this week. The failure mode is not a wrong log, it is a correct log nobody read in time.

It is also disconnected from the parts it consumes. Fitting a filter should reduce spare parts stock by one, and in a spreadsheet it does not, so the parts you rely on for planned work are the ones most likely to be missing when you need them.

In StockFlow, the Assets module keeps equipment in the same system as stock: an asset registry with status and readiness, check-in and check-out, barcode scanning, and overdue alerts. It is included on Professional and above, or available as a $4/month add-on.

Related resources

Trusted by small businesses

What our customers say

Super Kind! Quick replies from their support and very easy fixes, changed the dashboard a bit and customized it. Also gave me 450 items extra on the free plan just for me. Highly recommend and again great service!

Erasable Trading AU

Best customer service! Stockflow's customer support is fast and extremely helpful. They assisted me with customization of the software to improve my experience as a user.

Justin M.

Co-Owner, Consumer Goods

Frequently asked questions

What should an equipment maintenance log record?
At minimum: which asset, when, what type of work, who did it, what parts were consumed, how long the asset was unavailable, and when the next service is due. Anything less turns into a list of dates that cannot answer whether a machine is getting worse.
Should preventive and corrective work be in the same log?
Yes, with a column separating them. The ratio between planned and breakdown work per asset is the most useful number the log produces, and it only exists if both kinds of work land in the same place.
How do I schedule the next service from this sheet?
Fill in Next_Service_Due on every row, then sort the sheet by that column to get a due list. For meter-based intervals, record the meter reading at each service and set the next due value in meter units rather than dates.
How does a maintenance log relate to spare parts stock?
The Parts_Used column is the demand history for your spare parts. Parts that appear repeatedly across the log are the ones worth holding, and parts that have never appeared are usually the ones quietly tying up money on a shelf.
When does a spreadsheet maintenance log stop being enough?
When nothing reminds you. A sheet records what happened but cannot tell you that a forklift examination is due in nine days, so preventive work slips until something breaks and the log becomes a record of corrective work only.