What each BOM organizes
An engineering BOM (EBOM) is structured the way a product's engineering design breaks down — by drawing, part number, and design hierarchy. It reflects how a design engineer thinks about the product: this sub-assembly, containing these parts, per this drawing revision.
A manufacturing BOM (MBOM) is structured the way the product actually gets built and purchased — by production step, work order, and what needs to be bought or made in what sequence. It can include items an EBOM would not, like packaging materials, consumables used in assembly, or intermediate items that only exist as a step in the build process rather than the final design.
Why the two sometimes diverge
For a simple product built roughly the way it was designed, one BOM can do both jobs — this is the normal case for small manufacturers and makers. The split becomes necessary when production reality departs from the design structure: an engineering sub-assembly that gets purchased pre-built rather than assembled in-house, packaging and consumables that never appear on an engineering drawing but do consume inventory, or a product built in a different sequence than its design hierarchy suggests.
- EBOM: organized by design structure, drawing revision, and engineering part numbers
- MBOM: organized by build sequence, purchased vs. made items, and what production actually consumes
- Packaging, consumables, and purchased sub-assemblies often appear in an MBOM but not an EBOM
Track this in StockFlow instead of a spreadsheet
Live stock levels, reorder points and low-stock alerts on the free Starter plan. No credit card.
Do you actually need to split them?
Most small manufacturers and makers do not need a formal EBOM/MBOM split — a single, well-maintained multi-level BOM that reflects how the product is actually built covers both design reference and production needs. The distinction becomes worth the overhead once a dedicated engineering team maintains product design independently from a production team that has to translate that design into a repeatable build process, which is typically a mid-size-to-large manufacturing concern rather than a small shop.
Prevent stockouts automatically with StockFlow
Start your 14-day Pro trial. No credit card. Afterwards, keep using StockFlow free on Starter.